    Construction name

    Construction period

    Original building

  • Construction

    GS Donghae Electric Power Unit 1 Turbine Reheated Steam Piping Leakage Work

    22.04.28~22.05.06

    GS Donghae Electric Power Co., Ltd

  • Construction

    GS Donghae Power #1,2 boiler tube reinforcement and valve replacement Corporation

    22.04.11~22.05.08

    GS Donghae Electric Power Co., Ltd

  • Construction

    Jeonju WinPower Boiler Tube Repair Work (BioSTG2)

    22.02.15~22.04.05

    Jeonju Win Power Co., Ltd

  • Construction

    Water pipe replacement work for unit 2 boiler 1 of Yangsan Resource Recovery Facility

    22.02.15~22.04.05

    POSCO O&M Co., Ltd

  • Construction

    New Boryeong #2 FRH Shortened Platedn SH Tube Replacement Subcontracting

    22.03.04~22.05.22

    NS System Co., Ltd

  • Construction

    Water pipe replacement of waste heat boiler at Mapo resource recovery facility

    22.07.29~22.11.20

    Hanjong Industrial Development Co., Ltd

  • Construction

    Yeongheung Unit 1 Boiler FSH Inlet HDR Conn. Tube Replacement Work

    21.08.23~22.04.30

    Doosan Energy Co., Ltd

  • Construction

    Taean #7,8 Boiler FSH & FRH Tube Replacement Work

    21.10.07~23.05.30

    Doosan Energy Co., Ltd

  • Construction

    Purchase of gas turbines and gas turbines of Gimpo combined power plant; Installation of gas turbines and attached facilities of GPKG#1,2

    21.10.29~23.07.30

    Doosan Energy Co., Ltd

  • Construction

    Bio #2 Boiler Tube Repair Work

    21.07.14~21.12.28

    Jeonju WinPower Co., Ltd

  • Construction

    Yangsan Resource Recovery Facility Unit 1 Boiler 1 Water Pipe Replacement Construction

    21.09.01~21.10.08

    POSCO O&M Co., Ltd

  • Construction

    DongHae Biomass Boiler Furnace Replacement Work

    21.08.23~21.10.22

    Susan Industries Co., Ltd

  • Construction

    [Taean IGCC '21 Maintenance] PKG9 Drag Chain and Vibrating Screen Replacement

    21.05.21~21.12.17

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Replacement of boiler FRH tube of Yeongheung #3

    21.03.08~21.05.18

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yangsan Resource Recovery Facility Unit 1 Boiler Unit 2 Water Pipe Replacement Work

    21.02.19~21.03.15

    POSCO O&M Co., Ltd

  • Construction

    Support for the dismantling, installation, and commissioning of large GT test buildings Phase I and II

    20.03.20~22.01.28

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Installation of IGCC C-1701B Degreaser in Taean

    19.11.29~20.07.30

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    DongHae Biomass Boiler Tube Replacement Work

    20.09.12~20.11.10

    Susan Industries Co., Ltd

  • Construction

    Boryeong #7,8 Boiler FRH Tube Bundle Replacement Work

    20.05.25~20.12.31

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Replacement of the Taean PKG2 Drag Chain

    20.05.25~20.12.31

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Replacement of Youngheung #4Duct

    20.04.29~20.07.30

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongheung #4 Seperator Hemi Head Replacement Construction

    20.04.01~20.07.30

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Shin Boryeong #2 HP Bypass Repair Work

    20.03.06~20.06.24

    ㈜신동아이엠에스

  • Construction

    2020 Air Force Unit 2 Turbine Electrical Equipment Class A Planned Preventive Maintenance Work

    2020.03

    Korea Western Power Co., Ltd.

  • Construction

    2020 Shin Boryeong Unit 2 Planned Preventive Maintenance Project (Boiler Facility)

    2020.03~2020.05

    Shindong IMS Co., Ltd.

  • Construction

    Phase I,II dismantling, installation and commissioning support for large GT test building

    2020.06~

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    [Youngheung#4] Seperator Hemi Head Replacement Work

    2020.04~2020.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #9 BFPT-A Dish. Replace Check Valve

    2020.04~2020.05

    KEPCO KPS Co., Ltd.

  • Construction

    Yeongheung#4 Duct Replacement Work

    2020.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    PKG2 Drag Chain Replacement and Emergency Outlet Establishment

    2020.05.~2020.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Pukpyeong #1 SH Spray Valve Drain Line Construction Work

    2019.03~2019.04

    Fisheries Industries Co., Ltd.

  • Construction

    Installation of the minimum flow valve at Bukpyeong Unit 1

    2019.05~2019.05

    GS Donghae Electric Power Co., Ltd.

  • Construction

    Taean #2 Boiler Main Steam Piping Damage Maintenance

    2019.11~2019.11

    Korea Western Power Co., Ltd.

  • Construction

    Outsourcing Maintenance of Cracks in HRH Pipe of Pyeongtaek Thermal Power Plant #2

    2019.11~2019.11

    Korea Western Power Co., Ltd.

  • Construction

    HRH Pipe Maintenance for Pyeongtaek Energy Units 1 and 2

    2019.12~2019.12

    Korea Western Power Co., Ltd.

  • Construction

    Taean IGCC C-1701B Derailment Installation Work

    2019.11~2020.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Biomass donghae eva wing wall the purchase

    2019.12~2020.03

    Korea East-West Power Co., Ltd.

  • Construction

    Buy thermal biomass superheater tube donghae

    2019.12~2020.09

    Korea East-West Power Co., Ltd.

  • Construction

    Yeongheung#3 HRH Spool Pipe Replacement Work

    2019.02~2019.03

    Korea South-East Power Co., Ltd.

  • Construction

    Yeongdong Thermal Power #1 Fuel conversion facility (manufacturing and installing convenience facilities for meter access)

    2019.02~2019.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongheung Thermal Power Co., Ltd. #2 Ring Header Connection Tube

    2019.03~2019.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Sin Boryeong #1 HP Bypass Valve Repair Work

    2019.04~2019.05

    Korea Midland Power Co., Ltd.

  • Construction

    Taean IGCC Gasification Plant (2019 OH Corporation)

    2019.04~2019.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongdong Thermal Power Plant #2_MCC Room / Electronic Equipment Room Reinforcement Work

    2019.05~2019.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean IGCC 19 years maintenance repair welding

    2019.06~2019.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    [Shin Bo-ryeong #1,2] Removing the sleeve in the boiler PH & repairing the spring nozzles

    2019.04~2019.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean IGCC Gasification Plant (HP Economizer Installation Works)

    2019.07~2020.01

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Biomass donghae WTR wall tube a replacement.

    2019.07~2019.09

    Fisheries Industries Co., Ltd.

  • Construction

    Taean IGCC X-1701 A,B Conveyor Installation Works

    2019.11~2019.12

    Korea Western Power Co., Ltd.

  • Construction

    HRH Pipe Maintenance Works for Energy Units 1 and 2

    2019.11~2019.11

    Korea Western Power Co., Ltd.

  • Construction

    Yeongheung Thermal Power Plant #2 (Boyler FSH Inlet Header. Tube Replacement)

    2019.04~2019.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean IGCC 'Planning Preventive Maintenance' (HPHT Filter Inspection)

    2019.06~2019.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean IGCC Sanseong Slurry Debris Installation Works

    2019.07~2019.08

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Units 7 and 8 boiler FSH In-Outlet Tube Bundle Replacement Work

    2018.07~2019.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Outsourcing Service for Modifying Attemperator 1st & 2nd Stage of Shin Boryeong Unit 2

    2018.09~2018.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean IGCC Desalination Facility Emergency Repair Work

    2018.10~2018.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong #7,8 boiler FSH Outlet Bundle Replacement Work

    2017.12~2019.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Production

    [Shin Bo-ryeong #2] Boiler Pri during the OH period. SH Tube Corrective Operation Service

    2020.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Production

    [Shin Bo-ryeong #1,2] Three on-site modification work during OH period of Unit 2 (Boiler Pressure Division,GAH Section)

    2020.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Production

    [Gangneung Anin #1,2] Outsourcing service for technical support of boiler pressure

    2020.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Production

    Self-restraint purchase of electric dust collector for North Peace Power Plant No. 1

    2019.01~2019.02

    GS Donghae Electric Power Co., Ltd.

  • Production

    Five types of purchase other than Pipes

    2019.03~2019.04

    GS Donghae Electric Power Co., Ltd.

  • Production

    Purchase of North Peace Power Boiler Tube Protector

    2019.03~2019.04

    GS Donghae Electric Power Co., Ltd.

  • Production

    Outsourcing the Crank Set of DE Chuta System for Unit 1 Electrostatic Precipitator

    2019.12~2019.12

    GS Donghae Electric Power Co., Ltd.

  • Production

    North Korean Peace Force Furnace Nose Wall Tube Protector Production

    2019.02~2019.02

    Fisheries Industries Co., Ltd.

  • Production

    East Sea inside # 2 fbac clinkek, and refractories, tube protector

    2019.04~2019.04

    Fisheries Industries Co., Ltd.

  • Production

    East Sea two # 1 oh protector

    2019.05~2019.06

    KEPCO KPS Donghae

  • Production

    East Sea # 1 oh the protector

    2019.05~2019.06

    KEPCO KPS Donghae

  • Production

    Samcheok. Outsourcing tube and membrane

    2019.06~2019.06

    Korea Southern Power Co., Ltd.

  • Production

    Furnace Fluidzing Air Nozzle

    2019.07~2019.08

    KEPCO SPC POWER COPRATION

  • Production

    Furnace Fluidzing Air Nozzle (200pc)

    2019.09~2019.10

    KEPCO SPC POWER COPRATION

  • Production

    Purchase of Tube Bundle for Wonju 1st Superheater

    2019.06~2020.03

    Korea Midland Power Co., Ltd.

  • Production

    Biomass donghae furnace wtr wall production supply design tube

    2019.07~2019.07

    Korea East-West Power Co., Ltd.

  • Production

    Boiler supply for Units 9 and 10 of Dangjin Thermal Power Plant

    2019.09~2019.11

    Daelim Industrial Co., Ltd