한중플랜트
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
주메뉴
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
Business
Area
Engineering
Manufacturing
Construction
Technical
Management
Introduction of
Technology
Facility status
Business
Performance
Domestic
Performance
Overseas
Performance
Company
Introduction
Introduction of
Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer
Support
Notice
Recruitment
Information
Q&A
PERFORMANCE
Domestic
Overseas
Domestic Performance
HOME
Business Performance
Domestic Performance
Construction Period
2019~Present
2015~2018
2013~2014
2010~2012
2007~2009
2005~2007
2001~2004
[POSCO] FINEX PSA UNIT Assembly
2006.03~2006.05
[Doosan Heavy Industries & Construction Co., Ltd.] DOOPEX boiler facility construction of technical research institute
2005.12~2007.07
[POSCO] Expansion of FINEX facilities
2005.06~2005.10
Replacing the Medium Pressure Turbine MSV
2005.04~2005.05
all
Construction
Production
Field
Construction name
Construction period
Original building
Production
Production condition of installation of HRSG main idol DMPR 1SET
2006.11~2007.05
Korea Western Power Co., Ltd.
Production
Taean Thermal Power Plant 7,8 MANUAL
2006.11
Doosan Heavy Industries & Construction Co., Ltd.
Production
In addition to drawing up pressure vessels and heat exchangers
2006.11
Bumwoo ENG Co., Ltd.
Production
Ulsan Thermal Power Plant #4-6 Design Drawing
2006.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
DOOPEX Phase-1 PJT Valve
2006.11
copper beam valve
Construction
DOOPEX Phase-1 PJT Fabrication and installation of additional miscellaneous steel frames
2006.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Pohang POSCO FINEX PSA UNIT Assembly Works
2006.10
POSCO
Production
Ulsan Thermal Power Plant #4-6 Design Drawing
2006.09
Korea East-West Power
Construction
Busan Composite #3,4 HRSG O/H Repair Operation
2006.09
Doosan Heavy Industries & Construction Co., Ltd.
Production
Ulsan Thermal Power Plant #4-6 Design Drawing
2006.09
Korea East-West Power
Production
Experimental Furnace Front Modification
2006.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
DOOPEX Phase-1 PJT(GAS Burner & W/BOX Installation)
2006.09
Doosan Heavy Industries & Construction Co., Ltd.
Production
Ulsan Thermal Power Plant #4-6 Design Drawing
2006.05
Korea East-West Power
Construction
HRSG Module Casing Repair Work
2006.05
GS EPS Co., Ltd.
Construction
Huvis C/B Mill Regular Repair and Test Operation
2006.04
Huvis Co., Ltd.
Construction
Pohang POSCO FINEX OFF GAS LINE Extension Works
2006.02
Bumwoo ENG Co., Ltd.
Construction
DOOPEX Phase-1 PJT(Boiler Package)
2005.12~2007.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Thermal Power Plant #3-6 BLR MANHOLE Replacement Work
2005.11~2007.01
Doosan Heavy Industries & Construction Co., Ltd.
Production
Yeongnam Thermal Power Plant #2 Boiler Performance Design Service
2005.11~2007.01
Doosan Heavy Industries & Construction Co., Ltd.
Production
Yeongnam Thermal Power Plant #2 Boiler Performance Design Service
2005.08
Korea Midland Power Co., Ltd.
Construction
Pohang POSCO Sintering FGCS
2005.08
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Gwangyang POSCO 2CDQ BLR Facility Chemical Cleaning and Water Piping Installation
2005.08
POSCO
Construction
Gwangyang POSCO 2CDQ BLR Facility Replacement Corporation
2005.08
POSCOPOSCO
Construction
Pohang POSCO FINEX OFF GAS LINE Extension Works
2005.06-2005.10
POSCO
Construction
Ulsan #1 Heavy Pressure Turbine Control V/V Replacement
2005.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Combined GT24
2005.04
Korea Midland Power Co., Ltd.
Construction
Huvis C/B Mill Regular Repair and Test Operation
2005.04
Huvis Co., Ltd.
Construction
Taean #5 Coral BNR O/Sleeve Ceramic Repair
2005.04
Korea Western Power Co., Ltd.
Construction
Taean #6 De-sulfurization Facility GGH SHAFT Replacement Work
2005.03
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Repair of OUTLET DAMPER for Taean #6 desulfurization facility
2005.03
Doosan Heavy Industries & Construction Co., Ltd.
Production
Samcheon Fire Power Spray Piping Drawing Service
2005.02
Korea South-East Power Co., Ltd.
Production
Yeongnam Thermal Power Plant #2 Boiler Performance Design Service
2005.01-2005.03
Korea Southern Power Co., Ltd.
Construction
Boryeong Combined GT24
2005.01-2005.03
Korea Midland Power Co., Ltd.
Production
Yeongnam Thermal Power Plant #2 Design Service for the Construction of Air Preheater
2005.01-2005.03
Korea Southern Power Co., Ltd.
Production
Yeongnam Thermal Power Plant #2 Boiler Performance Design Service
2005.01-2005.03
Korea Southern Power Co., Ltd.