한중플랜트
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
주메뉴
Business Area
Engineering
Manufacturing
Construction
Technical Management
Introduction of Technology
Facility status
Business Performance
Domestic Performance
Overseas Performance
Company Introduction
Introduction of Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer Support
Notice
Recruitment Information
Q&A
Business
Area
Engineering
Manufacturing
Construction
Technical
Management
Introduction of
Technology
Facility status
Business
Performance
Domestic
Performance
Overseas
Performance
Company
Introduction
Introduction of
Hanjung Plant
ESG management
History
CI
Organization Chart
Directions
Customer
Support
Notice
Recruitment
Information
Q&A
PERFORMANCE
Domestic
Overseas
Domestic Performance
HOME
Business Performance
Domestic Performance
Construction Period
2019~Present
2015~2018
2013~2014
2010~2012
2007~2009
2005~2007
2001~2004
Hadong thermal power plant #1 electrostatic precipitator 2nd row internal product Replacement Work
2012.10~11
Donghae Thermal Power FBHE and FBAC Equipment Reinforcement Material Purchase Project
2012.01~04
STX Gumi Power Plant Unit 2 Electric Dust Collector Life Extension Construction
2012.01~04
[Doosan Heavy Industries & Construction Co., Ltd.] Sea Part #1~3 BLR Header & Tube
2010.05~2010.12
all
Construction
Field
Construction name
Construction period
Original building
Construction
Hadong thermal power plant #1 electric dust collector internal product Replacement Work
2012.10~2012.11
Korea Southern Power Co., Ltd.
Construction
Yeongwol Combined Cycle Power Plant #1~3 piping and sup't separation part restoration work
2012.10~11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean Thermal Power Steam Blowing Installation
2012.10~11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Thermal Power Steam Blowing Installation
2012.10~11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong #8 Boiler tube single tube replacement and DAMPER repair (OH)
2012.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 8 FRH Flexible Connector maintenance work
2012.10
Korea Midland Power Co., Ltd.
Construction
Dangjin #8 & Boryeong #8 FRH Connector rupture repair
2012.09~12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Welding work for the bottom hopper membrane Boryeong #3
2012.06~2012.07
Korea Midland Power Co., Ltd.
Construction
Boryeong Unit 2 SH Outlet Tube single pipe Replacement Work, etc.
2012.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Unit 7,8 DRIP POT Replacement Work
2012.04~06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Ulsan #3 medium pressure turbine control valve replacement
2012.04~2012.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean #2 boiler access door and seal plate Replacement Work
2012.04~05
Korea Western Power Co., Ltd.
Construction
Taean Unit 2 Final Rh Sleeve Restoration Work
2012.04~05
Korea Western Power Co., Ltd.
Construction
Taean #2 FCMS hole processing installation work
2012.04~05
Korea Western Power Co., Ltd.)
Construction
Boiler No. 3 boiler tube maintenance work
2012.04~05
Korea East-West Power Co., Ltd.
Construction
Hadong 7th Unit 8 Herter Repair Work
2012.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Taean No. 2 Electrostatic precipitator of grain collecting and Repair Work
2012.04
Korea Western Power Co., Ltd.
Construction
Welding work of Hadong Unit 7 IP Snout Pipe Lower Site
2012.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Gumi Power Plant #2 Electric Dust Collector Life Extension PJT Jung Gumi #2 EP Manufacturing and Installation
2012.03~2012.07
GS E&R
Construction
STX Energy Co., Ltd. Gumi Power Plant #2 Electric Dust Collector Life Extension Construction
2012.03~07
STX Energy
Construction
Hadong 7 Boiler 2nd year O/H Repair Work
2012.03~2012.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Thermal Power Steam Blowing Installation
2012.03~04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong No. 5 Bottom Hopper Tube Membrane Welding
2012.02~08
KEPCO KPS Co., Ltd.
Construction
Boryeong 8 FRH Tube Emergency Repair/Dangjin 8 FRH Tube Emergency Repair
2011.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong 7 FSH Tube emergency repair
2011.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongwol Combined Cycle Power Plant #1~3 Pipe Sup't Departure Restoration Work
2011.10~2011.11
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongwol Combined Cycle Power Plant #1~3 piping Sup't departure repair
2011.10.
Korea Plant Service Yeongwol Office
Construction
No.1 Boiler SH Tube Replacement Work
2011.10.
C-Tech Co., Ltd.
Construction
Boryeong 6 Slop Tube Bending Outsourcing
2011.9~2011.10
KEPCO KPS Co., Ltd.
Construction
Boryeong 6 Control Valve Performance Test (2nd)
2011.9~2011.10
Korea Midland Power Co., Ltd.
Construction
Boryeong 6 Control Valve Performance Test (1st)
2011.9~2011.10
Korea Midland Power Co., Ltd.
Construction
Boryeong 6 Water cooling wall 1~4 corner 66 places Spiral tube replacement
2011.9~2011.10
KEPCO KPS Co., Ltd.
Construction
Boryeong No. 6 BOTTOM HOPPER tube membrane welding work
2011.9~2011.10
KEPCO KPS Co., Ltd.
Construction
Hadong 8 W/W Tube Stone Pipe
2011.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Thermal Power Plant No. 6 and 8 boiler final reheater tube Replacement Work
2011.6~2011.9
Korea East-West Power Co., Ltd.
Construction
Boryeong No. 5 Boiler Tube Membrane Welding (Preliminary)
2011.06
KEPCO KPS Co., Ltd.
Construction
Spot welding of Hadong Unit 8 SNOUT PIPEs
2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 8 Boiler PSH Tube Rupture Repair Work
2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Pressure Switch Tubing work for HPBP valve of Hadong Unit 8
2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Unit 6 Boiler Duct Eco. Tube Replacement Work
2011.06
Iljin Energy Co., Ltd.
Construction
Wall PNL Replacement Work for Boryeong Unit 5 (Flex.Conn. cutting/installation)
2011.06
KEPCO KPS Donghae
Construction
Boryeong Unit 8 boiler FRH TUBE Replacement Work
2011.06
Korea Midland Power Co., Ltd. Boryeong Thermal Power Headquarters
Construction
Hadong Unit 8 Boiler OH Repair Work
2011.05~2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Unit 7,8 boiler FRH Tube Replacement Work
2011.05~2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong 78, Boryeong 78, Taean 78 boiler steam blowing facility installation work
2011.05~2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong 7/8 CRH DRIP POT water level control system pipe Replacement Work
2011.05~2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong 7/8 MAIN TBN LO double piping Repair Work
2011.05~2011.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 1 Boiler Performance Improvement Work First Year O/H Repair
2011.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin 7th Boiler SOFA W/W tube burst recovery work
2011.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Unit 7 Boiler Final Reheater Tube Replacement Construction
2011.05
Korea East-West Power Co., Ltd. Dangjin Thermal Power Headquarters
Construction
Dangjin Unit 5 boiler FRH TUBE and Duct Eco. Tube Replacement Work
2011.04~2011.05
Korea East-West Power Co., Ltd.
Construction
Boryeong Unit 7 boiler FRH tube single tube replacement and Protector installation work
2011.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
OH Repair Work for the second year of Boryeong Unit 7 boiler
2011.03~2011.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
2 Repair Work besides replacing the link pipe of the Boryeong Unit 7 boiler
2011.03~2011.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Namjeju #3 seawater piping pinhole defect treatment
2010.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Namjeju Unit 3 desulfurization facility GGH Repair Work
2010.10
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Honam #2 BLR S/B Opening PNL Seal box tube recovery
2010.09
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Superheater Tube Replacement Work
2010.08~2010.09
Seedeck Co., Ltd.
Construction
Settlement Repair Work for the buried road in the middle hot water double heat storage incinerator in Dadae District 5
2010.08
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Unit 5 LTRH Outlet Link Pipe Weld Crack Repair
2010.07
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin #5 boiler PSH tube restoration work
2010.07
Korea East-West Power Co., Ltd.
Construction
Boryeong #7 FRH stone pipe
2010.07
Korea Midland Power Co., Ltd.
Construction
Boryeong #8 PSH tube rupture recovery
2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Yeongheung Unit 1 BLR FSH Tube
2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Sipat #1~3 BLR Header & Tube
2010.05~2010.12
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 8 FSH & FRH Tube Oxidation Scale Removal
2010.05~2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 8 Economizer Tube replacement and 2 other cases
2010.05~2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Unit 8 BLR 1st Year Overhaul
2010.05~2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Unit 7 FSH & FRH Tube Scale
2010.05~2010.06
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Dangjin Unit 7 BLR 2nd Year Emergency Overhaul
2010.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Unit 7 BLR Platen SH Tube Leak
2010.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong Unit 7 TRN HIP Inlet Snout Pipe
2010.04
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Hadong 7th BLR First Year Overhaul
2010.03~2010.05
Doosan Heavy Industries & Construction Co., Ltd.
Construction
Boryeong Co. Gen. Gas Turbine(GT24)
2010.01
Doosan Heavy Industries & Construction Co., Ltd.