PERFORMANCE

Domestic Performance

  • HOME
  • Business Performance
  • Domestic Performance
  • Field

    Construction name

    Construction period

    Original building

  • Construction

    Hadong thermal power plant #1 electric dust collector internal product Replacement Work

    2012.10~2012.11

    Korea Southern Power Co., Ltd.

  • Construction

    Yeongwol Combined Cycle Power Plant #1~3 piping and sup't separation part restoration work

    2012.10~11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean Thermal Power Steam Blowing Installation

    2012.10~11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Thermal Power Steam Blowing Installation

    2012.10~11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong #8 Boiler tube single tube replacement and DAMPER repair (OH)

    2012.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 8 FRH Flexible Connector maintenance work

    2012.10

    Korea Midland Power Co., Ltd.

  • Construction

    Dangjin #8 & Boryeong #8 FRH Connector rupture repair

    2012.09~12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Welding work for the bottom hopper membrane Boryeong #3

    2012.06~2012.07

    Korea Midland Power Co., Ltd.

  • Construction

    Boryeong Unit 2 SH Outlet Tube single pipe Replacement Work, etc.

    2012.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 7,8 DRIP POT Replacement Work

    2012.04~06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Ulsan #3 medium pressure turbine control valve replacement

    2012.04~2012.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #2 boiler access door and seal plate Replacement Work

    2012.04~05

    Korea Western Power Co., Ltd.

  • Construction

    Taean Unit 2 Final Rh Sleeve Restoration Work

    2012.04~05

    Korea Western Power Co., Ltd.

  • Construction

    Taean #2 FCMS hole processing installation work

    2012.04~05

    Korea Western Power Co., Ltd.)

  • Construction

    Boiler No. 3 boiler tube maintenance work

    2012.04~05

    Korea East-West Power Co., Ltd.

  • Construction

    Hadong 7th Unit 8 Herter Repair Work

    2012.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean No. 2 Electrostatic precipitator of grain collecting and Repair Work

    2012.04

    Korea Western Power Co., Ltd.

  • Construction

    Welding work of Hadong Unit 7 IP Snout Pipe Lower Site

    2012.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Gumi Power Plant #2 Electric Dust Collector Life Extension PJT Jung Gumi #2 EP Manufacturing and Installation

    2012.03~2012.07

    GS E&R

  • Construction

    STX Energy Co., Ltd. Gumi Power Plant #2 Electric Dust Collector Life Extension Construction

    2012.03~07

    STX Energy

  • Construction

    Hadong 7 Boiler 2nd year O/H Repair Work

    2012.03~2012.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Thermal Power Steam Blowing Installation

    2012.03~04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong No. 5 Bottom Hopper Tube Membrane Welding

    2012.02~08

    KEPCO KPS Co., Ltd.

  • Construction

    Boryeong 8 FRH Tube Emergency Repair/Dangjin 8 FRH Tube Emergency Repair

    2011.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong 7 FSH Tube emergency repair

    2011.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongwol Combined Cycle Power Plant #1~3 Pipe Sup't Departure Restoration Work

    2011.10~2011.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongwol Combined Cycle Power Plant #1~3 piping Sup't departure repair

    2011.10.

    Korea Plant Service Yeongwol Office

  • Construction

    No.1 Boiler SH Tube Replacement Work

    2011.10.

    C-Tech Co., Ltd.

  • Construction

    Boryeong 6 Slop Tube Bending Outsourcing

    2011.9~2011.10

    KEPCO KPS Co., Ltd.

  • Construction

    Boryeong 6 Control Valve Performance Test (2nd)

    2011.9~2011.10

    Korea Midland Power Co., Ltd.

  • Construction

    Boryeong 6 Control Valve Performance Test (1st)

    2011.9~2011.10

    Korea Midland Power Co., Ltd.

  • Construction

    Boryeong 6 Water cooling wall 1~4 corner 66 places Spiral tube replacement

    2011.9~2011.10

    KEPCO KPS Co., Ltd.

  • Construction

    Boryeong No. 6 BOTTOM HOPPER tube membrane welding work

    2011.9~2011.10

    KEPCO KPS Co., Ltd.

  • Construction

    Hadong 8 W/W Tube Stone Pipe

    2011.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Thermal Power Plant No. 6 and 8 boiler final reheater tube Replacement Work

    2011.6~2011.9

    Korea East-West Power Co., Ltd.

  • Construction

    Boryeong No. 5 Boiler Tube Membrane Welding (Preliminary)

    2011.06

    KEPCO KPS Co., Ltd.

  • Construction

    Spot welding of Hadong Unit 8 SNOUT PIPEs

    2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 8 Boiler PSH Tube Rupture Repair Work

    2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Pressure Switch Tubing work for HPBP valve of Hadong Unit 8

    2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Unit 6 Boiler Duct Eco. Tube Replacement Work

    2011.06

    Iljin Energy Co., Ltd.

  • Construction

    Wall PNL Replacement Work for Boryeong Unit 5 (Flex.Conn. cutting/installation)

    2011.06

    KEPCO KPS Donghae

  • Construction

    Boryeong Unit 8 boiler FRH TUBE Replacement Work

    2011.06

    Korea Midland Power Co., Ltd. Boryeong Thermal Power Headquarters

  • Construction

    Hadong Unit 8 Boiler OH Repair Work

    2011.05~2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 7,8 boiler FRH Tube Replacement Work

    2011.05~2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong 78, Boryeong 78, Taean 78 boiler steam blowing facility installation work

    2011.05~2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong 7/8 CRH DRIP POT water level control system pipe Replacement Work

    2011.05~2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong 7/8 MAIN TBN LO double piping Repair Work

    2011.05~2011.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 1 Boiler Performance Improvement Work First Year O/H Repair

    2011.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin 7th Boiler SOFA W/W tube burst recovery work

    2011.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Unit 7 Boiler Final Reheater Tube Replacement Construction

    2011.05

    Korea East-West Power Co., Ltd. Dangjin Thermal Power Headquarters

  • Construction

    Dangjin Unit 5 boiler FRH TUBE and Duct Eco. Tube Replacement Work

    2011.04~2011.05

    Korea East-West Power Co., Ltd.

  • Construction

    Boryeong Unit 7 boiler FRH tube single tube replacement and Protector installation work

    2011.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    OH Repair Work for the second year of Boryeong Unit 7 boiler

    2011.03~2011.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    2 Repair Work besides replacing the link pipe of the Boryeong Unit 7 boiler

    2011.03~2011.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Namjeju #3 seawater piping pinhole defect treatment

    2010.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Namjeju Unit 3 desulfurization facility GGH Repair Work

    2010.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Honam #2 BLR S/B Opening PNL Seal box tube recovery

    2010.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Superheater Tube Replacement Work

    2010.08~2010.09

    Seedeck Co., Ltd.

  • Construction

    Settlement Repair Work for the buried road in the middle hot water double heat storage incinerator in Dadae District 5

    2010.08

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Unit 5 LTRH Outlet Link Pipe Weld Crack Repair

    2010.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin #5 boiler PSH tube restoration work

    2010.07

    Korea East-West Power Co., Ltd.

  • Construction

    Boryeong #7 FRH stone pipe

    2010.07

    Korea Midland Power Co., Ltd.

  • Construction

    Boryeong #8 PSH tube rupture recovery

    2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongheung Unit 1 BLR FSH Tube

    2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Sipat #1~3 BLR Header & Tube

    2010.05~2010.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 8 FSH & FRH Tube Oxidation Scale Removal

    2010.05~2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 8 Economizer Tube replacement and 2 other cases

    2010.05~2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 8 BLR 1st Year Overhaul

    2010.05~2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Unit 7 FSH & FRH Tube Scale

    2010.05~2010.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin Unit 7 BLR 2nd Year Emergency Overhaul

    2010.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 7 BLR Platen SH Tube Leak

    2010.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 7 TRN HIP Inlet Snout Pipe

    2010.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong 7th BLR First Year Overhaul

    2010.03~2010.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Co. Gen. Gas Turbine(GT24)

    2010.01

    Doosan Heavy Industries & Construction Co., Ltd.