    Construction name

    Construction period

    Original building

  • Construction

    Design Service of Youngnam Thermal Power Plant DUCT

    2004.10

    Daeheunggi Gong Co., Ltd.

  • Construction

    ISO drawing of PG 1 sintering array recovery facility piping

    2004.10

    Bumwoo ENG Co., Ltd.

  • Construction

    In addition to the construction of INSULATION for Aju Metal New Plant

    2004.10

    Great Oil Pressure

  • Construction

    Aju Metal Coolant Insulation Work and Other

    2004.10

    sincere machine

  • Construction

    Southern Jeju#3,4 BLR DUCT Design Service

    2004.09-2004.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Repair of Boryeong Complex #7 BLR TUBE LEAK

    2004.07

    ENG.Service

  • Construction

    POSCO S/STEEL Design service

    2004.07

    Bumwoo ENG Co., Ltd.

  • Construction

    PG 1 Demolition/Installation of the old replacement of the sintering array recovery facility

    2004.06-2004.09

    Bumwoo ENG Co., Ltd.

  • Construction

    Seocheon Thermal Power Plant #1 SLOPE TUBE PANEL Replacement Work

    2004.03

    Bumwoo ENG Co., Ltd.

  • Construction

    Processing of Dangjin #5 TURBINE DIAPHARM

    2004.1

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Yeongheung A/H BRG Welding Work

    2003.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Glory#5,6 Replacement of ELBOW

    2003.12

    Sungkwang Band Co., Ltd.

  • Construction

    Boryeong Complex#1 Repairing HRSG HP SH HDR TUBE

    2003.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Complex#7,8 HRSG O/H Repair

    2003.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #5 Repairing the Temperature Sensing System of Non-Pass Gas

    2003.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Repairing the TUBE LEAK for Boryeong Complex #7

    2003.12

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #5 Repairing desulfurization OUTLET DAMPER

    2003.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #6 COAL BURNER Repair and Exception

    2003.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #6 ERECTION CON. FOR BRG & VALVE REPAIR

    2003.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #6 Fabrication/Installation of desulfurized DMPR P/FORM & LADDER

    2003.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #6 De-sulfurization GGH GUIDE TRUNNION SHAFT/BRG Replacement Work

    2003.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #6 Desulfurization DAMPER Repair Operation

    2003.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Demolition/installation of old replacement of PG 2 sintering array recovery facility

    2003.08-2004.02

    Bumwoo ENG Co., Ltd.

  • Construction

    East Sea of # 1, 2 bp wall but Remedial work and equipment replaced.

    2003.06-2003.08

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Taean #5 BLR DRIP SHIELD Deformation Exception

    2003.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    East Sea of # 1, 2 wall ring and tube header.

    2003.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    East Sea of # 1, 2 wall ring and tube header East Sea # 1 blr hdr and remuneration tube

    2003.01

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Thermal Power #6 Other than Repair of DAMPER

    2002.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Dangjin#4 WINDBOX UNDULATED PLATE Repair

    2002.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Excluding Dangjin #4 BLR BURNER NOZZLE TIP

    2002.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    SANPEDRO HRSG STACK thermal insulation works

    2002.09-2003.01

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    ADVANCED VORTEX BLADE Turbine Experimental Unit Piping

    2002.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Complex#1-8 HRSG OUTSTANDING ITEM Modification

    2002.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Thermal Power Plant #4 Demolition of desulfurization and desorption experimental facilities

    2002.07

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae h and fire # 1, 2 r tube the Repair Work.

    2002.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Repair besides BLR DESH SPRAY NOZZLE for seismic power #3

    2002.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Repair other than the TIP of the BLR BURNER NOZZLE TIP

    2002.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Complex#1-8 HRSG BAFFLE PLATE Reinforcement

    2002.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae r h, and fire # 1, 2 s h tube and complementary work replaced.

    2002.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Produce and install Boryeong Complex#1-8 HRSG HDR DRAIN LINE

    2001.11-2002.2

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Production and installation of HRSG STACK DMPR for Hallym Complex #1,2

    2001.11

    Doosan Heavy Industries & Construction Co., Ltd.