• image01

    The Center Of Maintenance For
    Generating Unit, Han-Jung Plant

    Having Know-How By Accumulating Skills And Experience In The Field Of Generating Unit

  • image04

    The Center Of Maintenance For
    Generating Unit, Han-Jung Plant

    Han-Jung Plant, An Advanced Company That Strives For Sustainable Growth With Global Technology

  • image02

    The Center Of Maintenance For
    Generating Unit, Han-Jung Plant

    Create New Values And History With Constant Change And Innovation

  • image03

    The Center Of Maintenance For
    Generating Unit, Han-Jung Plant

    The Challenge Of The Korea-China Plant For Bigger Dreams Continues

  • image04

    The Center Of Maintenance For
    Generating Unit, Han-Jung Plant

    We Will Lead The Future With Advanced Technology And Innovative Thinking

Producing Excellent Manufactures
Through The Optimum Design

On The Basis Of Design Technique Of Engineering, Han-Jung Plant Can Approach To Structural Understanding Quickly And Can Respond Flexibly To Technical Challenges. Consequently, We Can Provide A Differentiated Service Based On Know-How By Accumulating Skills And Experience In The Field Of Generating Unit

Technical Management

On The Basis Of Diverse Experience For Maintenance
Of Generating Unit, We Have Been Accumulating
Technical Skills Consistently. By Conducting Staff
Training And Management Service For Their
Development, We Put Top Priority On Technique

Design Capabilities

On The Basis Of Experience For Maintenance Of
Generating Unit And Technology, We Have
The Best Design Capabilities To Make Optimal
Durability To High Temperature, High Pressure,
Corrosion And We Even Consider Convenience
Of Site Operation

Major Design Tools

We Use Auto Cad(2d/3d Design), Analysis Of
Piping Stress, 3d Modelling As Major Design
Tools. Also By Building Variety Of
Collaboration With Other Companies,
We Can Respond To Customers Needs

EXPERIENCE

Performance Of Major Business

Performance Of Major Business

Engineering Research Center Of Doosan Heavy Industry

Facility Construction Of Doopex Boiler(Design, Manufacturing, Construction)

2005~2007

Tea-An Firepower

Installation Of Steam Blowing Equipment Of Tea-An-8

2013

Boryeong Firepower

Reinforcement Work For Frh Tube Of Boryeong-7

2013

STX Energy

Work For Service Life Expension Of Electric Precipitator Of Stx Gumi Power Plant-2

2012

Yeongheung Firepower

Replacement Of Reheat Steam Pipe, Maintenance Of Part Of Damage And Improvement Of Sensing Line

2017/2015

Samcheonpo Firepower

Manufacturing Of Boiler Furnace Hopper Access Door Of Samcheonpo-6

2015

POSCO

Finex Extension Of Heat Exchanger Equipment

2004/2005

Gunsan Seamangeum

Modification And Additional Installment Of Steal Frame Of Boiler

2015~2016

HANJUNG PLANT

We Doing Our Best

  • Possessing excellent skills for design and manufacturing Possessing Excellent
    Skills For Design
    And Manufacturing
  • Having a capability to carry out foreign assignment Having A Capability
    To Carry Out
    Foreign Assignment
  • Having a business competitiveness related with generation company and Doosan Heavy Industry Having A Business Competitiveness Related
    With Generation Company
    And Doosan Heavy Industry
  • A Specialized company in maintenance of generating unit A Specialized Company In
    Maintenance Of
    Generating Unit

CONTACT US

tel
+82-55-333-2002
fax
+82-55-299-0850
e-mail
hanjung@hanjungplant.co.kr
Directions
Directionsarrow

Notice

Recruitment information Recruitment information