    Construction name

    Construction period

    Original building

  • Construction

    Emergency Repair Work for Gangdong Group Energy Boiler Unit 1 in Seoul

    2014.12~2015.01

    COWON Energy Service Co., Ltd.

  • Construction

    Donghae Thermal Power Plant's emergency repair subcontract work (S/H-2W)

    2014.12

    Seokwon Industry Co., Ltd.

  • Construction

    Donghae Thermal Power Biomass Power Plant Emergency Repair Subcontract Work

    2014.11~2014.12

    Seokwon Industry Co., Ltd.

  • Construction

    Donghae Biomass power plant SH Tube Protector emergency Repair Work

    2014.11

    Seokwon Industry Co., Ltd.

  • Production

    Manufacturing and purchasing of tube assemblies for replacement of manholes at the bottom of boilers 1-6

    2014.09~2016.04

    Korea Southern Power Co., Ltd.

  • Construction

    Sejong Cogeneration Emergency Site Repair

    2014.09

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae FBHE RH, EVA, FBAC Tube maintenance work

    2014.09

    KEPCO KPS Donghae Branch

  • Construction

    Donghae Biomass power plant SH3 Coating Tube Replacement Work

    2014.08

    Korea East-West Power Co., Ltd.

  • Construction

    Donghae #2 FBHE RH, FBAC Tube maintenance work

    2014.07~2014.11

    Seokwon Industry Co., Ltd.

  • Construction

    Ain Sokhna Unit 1 SSH Coil Bundle Correction Work

    2014.06~2014.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Ain Sokhna construction penthouse casing installation

    2014.05~2014.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae Biomass Power Plant S/H TUBE Emergency Repair Work

    2014.05~2014.06

    Korea East-West Power Co., Ltd.

  • Construction

    Donghae Biomass plan preventive maintenance work (simple)

    2014.04~2014.05

    Seokwon Industry Co., Ltd.

  • Construction

    Boryeong Unit 2 SSH Out let tube Replacement Work

    2014.04~2014.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Emergency maintenance of Donghae #1 FBHE R/H Herder

    2014.04

    KEPCO KPS Donghae Branch

  • Construction

    2014 Plan 2 preventive maintenance work (simple)

    2014.03

    Seokwon Industry Co., Ltd.

  • Construction

    Yeungheung #3, 4 ME Washing Pump Replacement Work

    2014.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    [Ain Sokhna] No.1 Boiler Coil Support Lug Correction Work

    2014.02~2014.04

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong #7,8 defect Repair Work (Hot Reheat Line Hanger & Support defect Repair Work)

    2014.02~2014.03

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae Biomass Power Plant Construction SH Tube Repair

    2014.01

    Korea East-West Power Co., Ltd.

  • Construction

    Donghae No.1 FBHE-SH Tube emergency maintenance work

    2013.12

    Korea East-West Power Co., Ltd.

  • Construction

    Donghae Thermal Power Plant #2 Planned Preventive Maintenance Work (Intermediate)

    2013.11~2013.12

    Seokwon Industry Co., Ltd.

  • Construction

    Yeosu Unit 2 CFB boiler Wate Wall Tube Membrane thinning accident recovery work

    2013.11

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae FBHE SH & RING HEADER CRIN PIPE welding

    2013.10

    KEPCO KPS Donghae Branch

  • Construction

    Taean Unit 7 Steam Blowing Equipment MOV Control Cable Installation & Commissioning

    2013.09~2013.10

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 8 MSI (CV3) Flange Pipe Replacement Work and spot welding

    2013.05~2013.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong Unit 8 No3 Herter Repair Work

    2013.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Hadong #7 boiler simple maintenance and #8 boiler second year O/H additional work

    2013.04~2013.06

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Boryeong Unit 4 turbine main steam pipe Tee maintenance and boiler tube membrane improvement work

    2013.04~2013.06

    Korea Midland Power Co., Ltd.

  • Construction

    Hadong Thermal Power Plant Units 7 and 8 boiler final reheater (FRH) tube Repair Work

    2013.04~2013.05

    Doosan Heavy Industries & Construction Co., Ltd.

  • Construction

    Donghae Unit 2 Electric Dust Collector Fixed Dust Collector Calibration

    2013.04

    Korea East-West Power Co., Ltd.

  • Construction

    Reinforcement work for the FRH tube of the Boryeong No. 7 boiler

    2013.03~2013.04

    Korea Midland Power Co., Ltd.

  • Construction

    Yeosu 2 boiler water wall tube Repair Work

    2013.02

    Doosan Heavy Industries & Construction Co., Ltd.