    공사명

    공사기간

    원청사

  • 제작

    Separator Pipe for Boiler Unit 1 & 2 A class OH

    2023.08.03

    KEPCO SPC POWER CORPORATION

  • 제작

    Furnace Wall Tube Boiler U1 & U2 OH A class

    2023.07.04

    KEPCO SPC POWER CORPORATION

  • 시공

    SUPPLY OF LABOR AND CONSUMBALE MATERIALS FOR THE REPAIR AND NORMALIZATION OF UNIT 1 LPBP THROUGH PARTIAL PIPE AND FITTINGS REPLACEMENT

    2023.08.02~2023.09.08

    KEPCO SPC POWER CORPORATION

  • 시공

    REPLACEMENT OF REHEATER 1 OUTLET HEADER CONNECTION TUBE, SLEEVE AND MEMBRANE (LABOR AND CONSUMABLE MATERIALS) FOR THE “A” CLASS PLANNED OVERHAUL OF BOILER UNITS 1 AND 2

    2023.08.02~2023.10.18

    KEPCO SPC POWER CORPORATION

  • 시공

    SUPPLY OF LABOR AND MATERIALS FOR THE REPLACEMENT OF FURNACE WALL TUBE FOR BOILER UNITS 1 AND 2 FOR CLASS A OVERHAUL

    2023.08.06~2023.10.14

    KEPCO SPC POWER CORPORATION

  • 제작

    RH1 Outlet Header Connection Tubes for Boiler U1 & U2

    2022.03.07~2022.07.15

    KEPCO SPC POWER CORPORATION

  • 제작

    #11,12 HRSG LP EVA FINNED TUBE

    2022.03.07

    KOREA SOUTHREN POWER/Jordan

  • 제작

    Sliding connedtor Platen SH FEMALE SC-2외

    2021.11.24

    AES MONG DUONG POWER CO. LTD.

  • 제작

    Reheater 2 Outlet Header Stub Tubes for Boiler Unit 1&2

    2021.02.17

    KEPCO SPC POWER CORPORATION

  • 시공

    BOILER UNIT 1&2 - RH2 OUTLET HEADER STUB REPALCEMENT WORKS AND ALIGNMENT OF HEADER TO LINK

    2021.05.01~2022.07.01

    KEPCO SPC POWER CORPORATION

  • 시공

    BOILER UNIT 1&2 - RH1 OUTLET HEADER STUB REPALCEMENT WORKS AND ALIGNMENT OF HEADER TO LINK PIPE

    2020.06.27~2020.09.18

    KEPCO SPC POWER CORPORATION

  • 시공

    UNIT 1&2-RH OUTLET HDR STUB REPLACEMENT WORKS AND ALIGNMENT OF HDR TO LINK PIPE

    2020.08~2020.09

    KEPCO SPC POWER CORPORATION

  • 시공

    세부1,2호기 RH1 Stub Tube Repair Welding

    2019.09~2019.11월

    KEPCO SPC POWER CORPORATION

  • 시공

    RH1 Outlet HDR Stubs & Furnace Front Wall Tube Panel for BLR U1 & U2 (제작)

    2019.09~2019.11월

    KEPCO SPC POWER CORPORATION

  • 시공

    보츠와나(추가 배관공사 용접부 Crack보수작업)

    2019.04~2019.08

    두산중공업㈜

  • 시공

    사우디(Fadhili Combined Heat and Power Project)

    2019.04

    두산중공업㈜

  • 시공

    Cirebon LTSH 튜브포함 자제교체

    2019.12~2020.01

    PT. Cirebon Electric Power

  • 시공

    JORDAN HRSG 튜브수리

    2019.02~2019.02

    KOSPO/JORDAN L.L.C.

  • 시공

    사우디 파드힐리 복합화력-보일러 튜브 수리

    2019.04~2019.04

    두산중공업㈜

  • 시공

    Cirebon Steam Blowing Piping 교체공사

    2019.09~2020.01

    두산중공업㈜

  • 시공

    세부 보일러#1 - Reheater1 Oulet Header Stub 용접 수정작업

    2018.02~2018.03

    KEPCO SPC Corporation

  • 시공

    세부 보일러#2 - Reheater1 Oulet Header Stub 용접 수정작업

    2018.04~2018.04

    KEPCO SPC Corporation

  • 시공

    세부 KSPC발전소 1,2호기 보일러 튜브 코일 교체공사

    2018.10~2019.02

    KEPCO SPC Corporation

  • 시공

    일리안 HRSG 1-2 Primary 제열기 헤더 Outlet Attemperator Assembly교체

    2019.09~2019.10

    KEPCO IlijanCorporation